Department of State Hospitals
Patton Central Kitchen
San Bernardino, California
The new central kitchen and partial remodeling of seven existing satellite kitchens located in five separate buildings. The utilization of a new central kitchen which includes state of the art equipment, including parallel remote refrigeration system with temperature monitoring capabilities; cook-chill equipment (form-fill seal machine, kettles, chiller tanks); flight type dishwasher; energy efficient steam equipment; bakery rack ovens; blast chillers; variable speed exhaust hood systems and the operation of a cook-chill program. The cook-chill program allows the operation of a five day a week production schedule utilizing a food bank system.
Find your collection in the bottom right.
Project Data
Project Type | Completion |
---|---|
New Construction
Renovation |
2019 |
Engagement Type | Role |
Design-Bid-Build |
Programming / Concept / Foodservice Design / Construction Admin. |
Project Size | Foodservice Size |
36,000 Sq. Ft |
28,000 Sq. Ft |
Project Cost | Foodservice Cost |
$23,312,000 |
$4,700,000 |
LEED | Operation Type |
Gold |
Central Kitchen |
Serving Capacity | |
40,000 meal/day 1,527 beds |
We are very impressed with Webb’s interpersonal level of communication, and their attention to keep us well informed throughout the working relationship we have developed.”
Rodney K. Taylor | Former Director
Nutrition Services Dept. at Riverside Unified School District